Public Notice
FINAL NOTICE AND PUBLIC EXPLANATION OF A PROPOSED ACTIVITY LOCATED IN A 100-YEAR FLOODPLAIN
and
NOTICE OF INTENT TO REQUEST RELEASE OF FUNDS
June 6, 2024
City of Gilmer
110 Buffalo Street
Gilmer, Texas
903-843-2552
These notices shall satisfy three separate but related procedural requirements for activities to be undertaken by the City of Gilmer.
FINAL NOTICE AND PUBLIC EXPLANATION OF A PROPOSED ACTIVITY LOCATED IN A 100-YEAR FLOODPLAIN
This is to give notice that the City of Gilmer has conducted an evaluation as required by Executive Order 11988 and/or 11990, in accordance with HUD regulations at 24 CFR 55.20 Subpart C Procedures for Making Determinations on Floodplain Management and Wetlands Protection. The activity is funded under the Texas Community Development Block Grant Program and CDV23-0454. The proposed project(s) will take place on South Montgomery Street from Newsom to SH 154. Street improvements will include the reconstruction of approx. 2,790 linear feet of roadway utilizing reconstructed base materials, HMAC pavement, concrete valley gutter, manhole adjustments, installation of 2 headwalls, and all associated appurtenances. Project will also include all associated administration and engineering services.
The street improvement project is located within the city limits of the City of Gilmer. A portion of the project is in Zone A of the 100-year floodplain, which is approx. 0.3107 acres, however, the project does not occur in a wetland.
The City of Gilmer has considered the following alternatives and mitigation measures to be taken to minimize adverse impacts and to restore and preserve natural and beneficial values: 1) Constructing street improvements outside the floodplain area was considered, but projects would not be economically feasible. 2) No action; but that would allow the current road conditions to remain the same, resulting in a continued threat to public health and safety, as well as hazardous conditions for motorists and emergency responders. 3) Proceed with the repairs as proposed in a FEMA documented special flood hazard area. Mitigation Measures: 1) All proposed repairs/improvements must be performed within the existing footprint only and not widened, whereby no new or additional impacts to waters of the U.S., or other waters, are incurred. 2) Texas Commission on Environmental Quality (TCEQ) best management practices (BMP’s) must be incorporated to ensure that water quality standards are maintained. BMP’s that should be implemented during and after construction activities may include, but are not limited to, the following: a) Installation of hay bales and/or silt fencing along portions of the project route to minimize soil erosion if deemed necessary; b) Routine visual inspections of the project route after rainfall events; and 3) Seed the appropriate areas of the project route with perennial grasses following the completion of construction activities to reduce erosion.
The no action alternative is also impracticable because it will not satisfy the need to provide assistance to residents of the City of Gilmer. Without the proposed improvements, a continued threat to public health and safety will persist due to the continued deterioration of roads, as well as hazardous conditions for motorists and emergency responders.
It is our determination that there is no practicable alternative for locating the project in the flood zone area. This is due to: 1) reconstructing the streets to remove a threat to public health and safety, which makes the project more cost effective; 2) the need to construct an economically feasible project; and 3) the ability to mitigate and minimize impacts on human health, public property, and floodplain values.
The City of Gilmer has reevaluated the alternatives to building in the wetlands and has determined that it has no practicable alternative. Environmental files that document compliance with steps 3 through 6 of Executive Order 11988 and/or 11990, are available for public inspection, review and copying upon request.
There are three primary purposes for this notice. First, people who may be affected by activities in floodplain and those who have an interest in the protection of the natural environment should be given an opportunity to express their concerns and provide information about these areas. Commenters are encouraged to offer alternative sites outside of the floodplain, alternative methods to serve the same project purpose, and methods to minimize and mitigate impacts. Second, an adequate public notice program can be an important public educational tool. The dissemination of information and request for public comment about floodplain can facilitate and enhance Federal efforts to reduce the risks and impacts associated with the occupancy and modification of these special areas. Third, as a matter of fairness, when the Federal government determines it will participate in actions taking place in floodplain, it must inform those who may be put at greater or continued risk.
REQUEST FOR RELEASE OF FUNDS
On or about June 24, 2024 the City of Gilmer will submit a request to the Texas Department of Agriculture for the release of Community Development Block Grant Program funds under Section 104 of Title I of the Housing and Community Development Act of 1974, as amended, to undertake a project under Contract# CDV23-0454 for street improvements that will include the reconstruction of approx. 2,790 linear feet of roadway utilizing reconstructed base materials, HMAC pavement, concrete valley gutter, manhole adjustments, installation of 2 headwalls, and all associated appurtenances. Project will also include all associated administration and engineering services, for an estimated cost of $500,000.00 in HUD funds and $25,000.00 in non-HUD funds. The project shall take place on South Montgomery Street from Newsom to SH 154.
FINDING OF NO SIGNIFICANT IMPACT
The City of Gilmer has determined that the project will have no significant impact on the human environment. Therefore, an Environmental Impact Statement under the National Environmental Policy Act of 1969 (NEPA) is not required. Additional project information is contained in the Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at City Hall, 110 Buffalo Street, Gilmer, Texas 75644 and may be examined or copied weekdays at 8:30 a.m. to 4:30 p.m.
PUBLIC COMMENTS
Any individual, group, or agency may submit written comments on the ERR to Greg Hutson, City Manager at ghutson@etex.net. All comments received by June 21, 2024 will be considered by the City of Gilmer prior to authorizing submission of a request for release of funds.
Comments should specify which Notice they are addressing.
ENVIRONMENTAL CERTIFICATION
The City of Gilmer certifies to the State of Texas that Greg Hutson, in his capacity as City Manager consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. The State’s approval of the certification satisfies its responsibilities under NEPA and related laws and authorities and allows the City of Gilmer to use Program funds.
OBJECTIONS TO RELEASE OF FUNDS
The State will accept objections to its release of fund and the City of Gilmer’s certification for a period of fifteen days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Gilmer (b) the City of Gilmer has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR part 58; (c) the grant recipient or other participants in the development process have committed funds, incurred costs or undertaken activities not authorized by 24 CFR Part 58 before approval of a release of funds by the State; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58, Sec. 58.76) and shall be addressed to Texas Department of Agriculture at CDBG_EnvReview@TexasAgriculture.gov or PO Box 12847, Austin, Texas 78711. Potential objectors should contact the State to verify the actual last day of the objection period.
Greg Hutson
City Manager
